had chosen the “midpoint” rate of the group — the average of the single lowest and single highest rates. See Tennessee Gas Pipeline Co. v. FERC, 926 F.2d 1206, 1213 (D.C.Cir.1991) (stating that the midpoint is a “starting place”). When Northwest submitted its pro forma tariff sheets as mandated by the Commission’s July 14, 1999 order, however, it recalculated its rates using the median of the proxy group (the middle rate out of the five), which the Commission approved. See Median Rate Order, 90 FERC at 61,468. When the short- and long-term growth rates had been equally weighted, the midpoint rate was higher than the median rate, leading to a higher overall pipeline rate. With the change in weighting, the reverse was true. See Median Rate Order on Rehearing, 92 FERC at 61,095, 61,101. Petitioners estimate that the difference between the midpoint (13.33%) and median (13.67%) spells $3.2 million in added charges. They raise two objections. First, they claim that the Commission had no authority to reconsider how it selected a rate from the proxy group under the scope of our remand. Second, they argue that the Commission’s choice of the median was unreasonable.
We remanded to the Commission to enable it “to reconsider its decisions in light of Williston Basin v. FERC, 165 F.3d 54 (D.C.Cir.1999).” See Canadian Ass’n of Petroleum Producers v. FERC, No. 96-1336 (D.C.Cir. Mar. 26, 1999) (order remanding case), Petitioners’ Br. at Addendum B. This prescribed affirmatively what the Commission was required to do — reconsider the weighting issue that was directly affected by Williston. But under our cases such a remand restores jurisdiction to the Commission and “discretion to reconsider the whole of its original decision.” Southeastern Michigan Gas Co. v. FERC, 133 F.3d 34, 38 (D.C.Cir.1998). Because the Commission was within its authority to reconsider which rate of return to use, we reach the question whether the Commission provided a reasoned explanation for choosing the median over the midpoint or alternatively the mean.
The Commission’s orders and brief speak only to the choice between median and midpoint. Its orders pointed to the Transcontinental decision, where, besides changing the weighting of short- and long-term growth factors, it also selected the median instead of the midpoint. But it supplied only the most limited reasoning there. See Transcontinental Gas Pipe Line Corp., 84 FERC at 61,427-5. The Commission essentially reiterated its Transcontinental reasoning in this case:
[U]se of the median gives consideration to more of the proxy company numbers. The median is the point at which half of the numbers are higher and half are lower. The midpoint, on the other hand, merely represents an average of the highest and lowest of the numbers and completely disregards the middle three numbers.
Median Rate Order on Rehearing, 92 FERC at 61,095.
To a large extent this “explanation” merely describes the differences in calculating the median and the midpoint. Insofar as it seeks to justify on the basis of the number of numbers considered, it is not wholly accurate. The midpoint doesn’t “completely disregard!] the middle three numbers”; the highest and lowest numbers achieve their status by reference to all five numbers. But even if acceptable as an explanation for choosing the median over the midpoint, it fails as an explanation for rejecting petitioners’ proposal that the Commission use the simple arithmetic mean (either of all five, or of the middle three companies of the proxy group). See No. 99-1488 et al., J.A. at 105, 171,192-93.