permitted leaks from the line to flow onto appellees’ property, thereby rendering their premises unfit for business purposes. Appellees sought compensatory damages in amount of $5,000. Lebeck answered, admitting joint ownership of the Zia Court and denied all other allegations. He also cross-claimed against his lessee, Wofford, but that issue is not before us. Wofford, likewise, entered a general denial. He also alleged that any leak in the sewer line was due to a latent defect for which he was not responsible. The defendant Diffley was never served with process.
The jury awarded appellees damages in a total amount of $4,350; $750 for loss of profits, and $3,600 for inconvenience and annoyance. Judgment was entered upon the verdict and appellants appeal.
The sufficiency of the evidence to sustain the verdict is challenged. The walls of the courts are parallel to each other and the distance between them is less than 5 feet. The sewer line was constructed between the courts in 1947 by Le-beck or someone under his direction. When Wofford leased Zia Court in 1952, he did not know the location of the sewer line. Appellees purchased their court in 1952, and at the time they observed a dampness in the basement under one of their units. So, it is clear that the nuisance was in an incipient stage as early as 1952. This dampness spread and appellees noticed a slight odor coming from the basement. In the winter of 1953-1954, when heat was turned on in the basement, the odor was so strong that it was noticeable in 4 other units. The odor was such that appellees decided to call a plumber to locate the trouble. He uncovered the line and found it was made of clay tile, and there was a leaky connection. When toilets in the Zia Court were flushed, sewage disposal flowed from the opening. Wofford was immediately advised of this condition. He looked at the line, and then told Rudick to see Lebeck, the owner, about it. The owners were not in Gallup just then and Lebeck, Jr., who, at the time was caring for his father’s business, was contacted by Rudick and informed about its condition. In January, 1955, Wofford and Le-beck, Jr. together inspected the opened sewer line and Lebeck, Jr. asked Rudick for a little time to repair it. Later, Rudick again contacted Lebeck, Jr. and asked him what he planned to do about it. Lebeck, Jr. told him that his plumber was in Denver and that he would attend to it soon, or words to that effect. Finally, Rudick informed Lebeck, Jr. that if nothing was done by the middle of February, 1955, he would seek the advice of an attorney in the matter. In reply, Lebeck, Jr. told him “to go ahead and see a lawyer”, which Ru-dick did. Further, the City Building and Plumbing Inspector of Gallup made an inspection of appellants’ court in March, 1955. Fie found the opened hole was then